MDOT tree removal contractor will start work around March 8th for the removal of trees and brush along M-15 for the Cummings Drain and Paddison Drain project. The Paddison Drain is located between Kipp and Horton Roads and the Cummings Drain is located between Hill and Maple Roads. Work will be weather dependent. The work needs to be completed by the end of March. Message boards will be placed on M-15 near the culverts to keep motorists advised of the work. Traffic will be maintained with a flagging sequence, which will only allow one (1) lane of traffic through at a time.